|   | 1" PVC electrical conduit on east side of house. |
|   | 2 septic cleanouts in 3" line on east side of house. |
|   | 2" PVC for utility room floor drain is routed under air-conditioning pad and sloped at 1"/4'. |
|   | 2" PVC for utility room floor drain after pouring air-conditioning pad. |
|   | 2" PVC for utility room floor drain with 2" water softener drain tied in. |
|   | P-trap in 2" floor drain/water softener drain line |
|   | Propane line after bedding in sand. |
|   | Propane trench being filled in by Action Propane. |