The Tom & Nancy "Home" Page

Underground

Rough-In Details

The Tom & Nancy "Home" Page - Index
Living Room
Kitchen
Utility Room
Downstairs Bath
Store Room
Drive-Thru
Laundry Room
Bedroom
Master Bath
Glassed-In Porch
Study

  1" PVC electrical conduit on east side of house.

  2 septic cleanouts in 3" line on east side of house.

  2" PVC for utility room floor drain is routed under air-conditioning pad and sloped at 1"/4'.

  2" PVC for utility room floor drain after pouring air-conditioning pad.

  2" PVC for utility room floor drain with 2" water softener drain tied in.

  P-trap in 2" floor drain/water softener drain line

  Propane line after bedding in sand.

  Propane trench being filled in by Action Propane.