The Tom & Nancy "Home" Page

The Slab

Foundation engineer: George Pulliam
Foundation labor: Antonio Rodriguez
The Tom & Nancy "Home" Page - Index
Downstairs Floor Plan
Upstairs Floor Plan
Framing
Masonry
Roofing
Electrical
Air Conditioning
Painting
Insulation
Plumbing
Tape & Float
Texture
Propane

10/8/99
The forms go up.

Trenching the beams.

Getting serious.
The happy crapper arrives.

Almost ready to pour.

10/29/99
The first concrete truck arrives.

Feeding the concrete pump.
Builder, Larry Crabb, at left.


Concrete pump.

Concrete pump.

I took a lot of pictures of this.

This guy operated the boom from a little control box and poured the beams of the slab without labor.

Then the other guys went to work.


The concrete pump stretches to reach the far side of the house.


The finished slab.