| ||||||||
|
10/8/99 The forms go up. |
| Trenching the beams. |
|
Getting serious. The happy crapper arrives. |
| Almost ready to pour. |
|
10/29/99 The first concrete truck arrives. |
|
Feeding the concrete pump. Builder, Larry Crabb, at left. |
![]() |
![]() |
| I took a lot of pictures of this. |
| This guy operated the boom from a little control box and poured the beams of the slab without labor. |
| Then the other guys went to work. |
|
![]() |
![]() |